JK Cement ShieldMaxX is a white cement based Universal Waterproof Putty with Active SiH4 Molecules. Its ready to use property makes it suitable for both interior and exterior surfaces. The advanced formulation of the product protects the walls from dampness. It also provides a velvet like finish along with higher coverage.

Damp Resistance
JK Cement ShieldMaxX contains Active SiH4 Molecules, which reacts with Silica particles to form multiple layers of tightly knit & impregnable micro webs, resulting in water repellence, thus protecting the walls from dampness.

Longer Paint Life
JK Cement ShieldMaxX is formulated with advanced German technology, which helps in protecting the walls from dampness & efflorescence, resulting in longer paint life.

Anti-Efflorescence
Salt requires water as a medium to travel. JK ShieldmaxX hinders the movement of water, because of its revolutionary micro web formation technology thereby eradicating salt leeching on the coated surface.

Versatile
Ideal for both new painting and repainting.

Step-1
Surface Preparation
a. Surface should be firm and free from oil, dust and dirt & it should be cleaned with the help of a suitable cleaning object like wire brush / coir brush, followed by jet wash / water splash
b. Any holes and cracks should be repaired prior to application

Step-2
Preparation of Mix
a. Mix JK Cement ShieldMaxX Universal Waterproof Putty with 35%-40% clean potable water (by weight)
b. Mix thoroughly to make a uniform smooth lump-free paste. Keep mixing for at least 5-7 minutes preferably by a Mechanical stirrer

Step-3
Application Step 1
The thoroughly mixed mass is applied on the pre-wet wall surface from bottom to top in the upward direction uniformly with the help of a putty blade or similar tools

Step-4
Application Step 2

Apply the first coat on prepared surface and the putty applied surface should be left to dry for 4-6 hours, based on the humidity & ambient temperature. The optimum thickness of each coat should be between 0.5 to 1.0 mm and the thickness of the total coats should not exceed 1.5-2.0 mm

Step-5
Finishing Coat
Complete coating of surface by applying second coat of JK Cement ShieldMaxX Universal Waterproof Putty

Step-6
Drying
Leave the wall to dry for 2-3 days before paint application

Step-7
Finishing
Clean the wall with a dry cotton cloth to remove dust, dirt etc. and the smooth wall is ready for a top coat of premium paint

* Notes: Sanding of dried surface before paint application is non mandatory, yet if required, a very fine waterproof Emery Paper 300 No. may be used to provide extra smoothness to the prepared surface.

ShieldMaxX Technical Specification